# Fund control for ADU construction

Source: https://paykeeper.com/fund-control-for-adu-construction/
Publisher: PayKeeper, Inc. (licensed escrow company, NMLS 2401821, South Jordan, Utah)
Summary: Grant, loan and owner funds for ADUs held in one escrow and released on verified milestones, from permits to certificate of occupancy.

[Solutions](https://paykeeper.com/solutions/) / Construction & lending

Grants, construction loans and owner funds, released milestone by milestone.

Accessory dwelling unit projects often combine a state ADU grant, a construction loan and the owner’s own money, plus a factory if the unit is prefab. PayKeeper runs the whole budget as a 2-step payment: funds from every source are held in escrow, each milestone from permitting to certificate of occupancy is verified, and conditional release pays the right builder, factory or vendor.

[Schedule a demo](https://meetings-na2.hubspot.com/kelly-curtis/paykeeper-mtg) [How 2-step payments work](https://paykeeper.com/2-step-payments/)

Step one

## Escrow holds

Grant funds, construction loan draws and owner contributions, tracked by source in one escrow.

Between the steps

## Verification checks

Each ADU milestone, from design and permitting to delivery, utility tie-ins and certificate of occupancy.

Step two

## Conditional release pays

The builder, prefab manufacturer and vendors, with each source’s funds used under its own rules.

## ADU funding PayKeeper supports

### State ADU grants

Programs such as the CalHFA ADU Grant and LA County ADU Accelerator, with grant funds released on documented eligibility.

### Construction loans

Controlled draws that match lender requirements.

### Owner-builder projects

Structure and accountability for homeowners managing their own build.

### Prefab and manufactured ADUs

Factory deposits and progress payments coordinated with site work.

## The milestones verification checks

Each milestone is a release point with its own evidence.

### Design and engineering

Plans and engineering complete.

### Permitting

Building permit issued.

### Site prep and foundation

Site work and foundation inspected.

### Factory completion

Prefab unit completed at the factory.

### Delivery and set

Unit delivered and set on the foundation.

### Utility tie-ins and CO

Utilities connected and certificate of occupancy issued.

Licensed escrow company

Utah, NMLS 2401821, under state oversight.

Bank partners

JPMorgan Chase, Continental Bank and Zions Bank.

Security

SOC 2 Type II, dual signing on bank transactions.

Compliance

KYB/KYC, AML and OFAC screening at funding and release.

## Questions

Can grant money and loan money sit in the same escrow?

Yes. Each source is tracked separately, so grant funds follow program rules and loan draws follow lender rules.

How are prefab factories paid?

Factory payments are released on verified factory completion and delivery, so the homeowner isn’t exposed if the unit never ships.

What do grant administrators see?

An audit-ready record of every release, with the documentation that justified it.

## Escrow it. Verify it. Release it.

[Schedule a demo](https://meetings-na2.hubspot.com/kelly-curtis/paykeeper-mtg)